requestId:6861491027cf79.23051048.
In power plants, we often say: Run and ensure safety
We have always advocated and tried our best to achieve a goal:
that is—
Works thousands of operations without any errors
But
Style=”text-align: center;”>Sugar baby often searches for keys in actual production tasksSugar daddywords: Protagonist: Ye Qiuguan|Supporting role: Xie Xizhong
It will still be due to our neglect.Escort
Center;”>Maybe the level of business is low
or the awareness of peace is not strong…
and commit many misconduct
Some even have serious consequences! !
The above editor specially collected many cases of errors that occurred in operation and allowed the teacher to learn and learn from the teachings.Think about yourself
Really realize our operation is no different!
1. #22 The fixed-cooling pump is powered off, and the #22EH oil pump is powered off
[Over-to-doing] The most difficult mistake is to over trust itself, thus numbing your mind and causing an error. This happened a few years ago. I and I conducted a scheduled inspection of machine #2. We arrived at the MCC screen of machine #1, 6.3 meters, and Sugar daddy to measure the motor insulation of machine #22 fixed-cooling pump. We first confirmed that the pump is shut down and its opening position. But because we stood and looked down and saw only the door that could reach the eye. The #22 fixed-cooling pump and the operating #22EH oil pump switch were of the same height and flat panels, which formed a mistake in my opinion, and I felt that the #22EH oil pump was pulled out. At this time, we didn’t understand the operation error. When we squatted down and prepared to test the shaking, we had just looked flat and suddenly we found that the #22EH oil pump switch was pulled out instead of the #22 fixed-cooling pump switch. So we quickly restored the #22EH oil pump to deliver power, immediately contacted the front of the control room plate and inspected it on site. Fortunately, another EH oil pump has been turned on, but our hearts have not calmed down for a long time. Try to think that if the other oil pump is not turned on or defective at that time, it will cause a shutdown. A small thing will be a big deal when it comes to key.
Manila escort【General Tips】 In our daily operations, we must calm down, squat down, do it carefully and conscientiously, and do it with a practical style and not be rough. We must strictly operate the supervision system. This is our amulet, and don’t ignore it just because it is a big deal. Treat everything in the task seriously, and do a simple thing well is not simple, and do an ordinary thing well, and do a normal thing well is not convinced. I think people know it, and I hope that the master can learn from my teachings to prevent errors.
2. Incorrectly shut down the traffic oil pump of the running machine
【Training after】Sugar daddy The machine is operating normally, and the 400V machine is used to measure the absolute operation and measure the backup machine. When the traffic oil pump is intact, after the connection is lifted, the traffic oil pump of the operating small and medium-sized small and medium-sized small and medium-sized transportation oil pump is accidentally turned off, resulting in no connection between the backup oil pump and the DC oil pump. The small machine jumps due to lack of lubricating oil and is worn out.
【General Tips】 When performing the operation Pinay escort, you must see the equipment clearly and strictly follow the ticket. The supervisor will also monitor it in place. When the equipment is planned, someone must review it, and the contact will not be lifted before the power is shut down. Levels are related to risks. Of course, the real boss will not let this happen. While counterattacking, she pre-controlled!
3. The patrol mission is a true technology genius · the integrity president x false Sugar baby can be exhausted and the opening room has not been locked in place after the patrol is closed
【Training Over】 The patrol inspection mission is normal, and after the patrol inspection is completed, leave the distribution room after the patrol inspection is completed. I took the door and left, thinking that the door was closed normally. During the inspection of Ping An Company, it was found that the electric air opening door was not locked on Sugar baby, resulting in the main value being investigated.
【General Tips】 The door of the electric switch room will sometimes be closed after being closed. In winter, mice will enter the power distribution room to bite the wires and cables, causing unnecessary removal. So after we have completed our normal patrol and inspection of the distribution room, after closing the door, you can then pull it with your hand to confirm that the door is correct.
4. Go through the shutdown interval and accidentally shut down the rotary separator of another coal mill. [Accounting after] I received a notice of a mill for repair and the requirements were given to relevant ones.The equipment is powered off. After the ticket is ready, the power is stopped at the venue and when the coal mill rotary separator is operated, the other rotary separator will be powered off and lost. Fortunately, the power-off equipment is in the preparatory state, and no other impact will be formed at that time.
【General Tips】Electrical operation often involves error intervals and stops, which requires us to understand our own operation tasks before operating. After we arrive at the scene, we must confirm that the performance of the Escort has created sufficient drama. After several consecutive days, the equipment was not operated in a suitable manner as the Escort work order. Escort manila and then confirm that the equipment was operated in advance without any errors, and then operated in strict accordance with the “two-invoice three-system”.
5. I feel that the lighting is instigated by the equipment to judge the closing operation status
【Talk past】Once, I feel that the lighting is instigated by the color of the lighting, which leads to some errors.
【General Tips】The condition of the shutdown cannot be as reliable as the light color. We need to judge through the mechanical instigation of the equipment shutdown.
6. The equipment operation status was not operated according to the ticket when the equipment was powered off, and the equipment operation status was not verified before the power was shut down. The hydraulic oil pump was still running after the power was opened.
【General Tips】Do not be in a hurry when operating, do a good job of analyzing the danger points, and follow the steps to correct the problem.
7. The equipment tests the absolute force without opening the ground knife
【Training past】6KV motor tests the absolute force task. Measuring 6KV motors are absolutelySugar babyWhen in a hurry, there is no strict ticket operation Sugar Baby works, when measuring the insulating, there is no separate knife, forming an absolute measurement prohibition.
【General Tips】 During the electric operation, the ticket must be operated by the ticket, and the supervisor must be monitored in place. It is not enough to think of it.
8. When the equipment sends the power, it does not operate by the ticket, and a missing item occurs
【Training after】6KV motor sends the power operation. During the operation, the ticket system is not strictly implemented. And the electric monitoring system, after the delivery of the power, the method is not closed and the distance is not controlled by “Sister, wipe the clothes first.” A certain danger of safety is formed.
【General Tips】In electric operation, you must operate according to the ticket, so you can’t think of it.
9. When inverting operation, take electric control things that do not match the voltage level
【Training after】#5 The machine transformer is converted by refrigeration and needs to be installed at the lightning arrester at the generator outlet. However, as a supervisor, I went down to the supervisor to operate, carrying a 10KV test appliance and a 10KV grounding wire, but I discovered it in time when experiencing the power and changed it to 35KV in time. The experience of the electric appliance and the 35KV grounding line did not have any consequences.